GEORGIA POWER (PLANT SCHERER)
IN Electrical Projects, I&C Projects, IT Projects
Investor Name:
GEORGIA POWER (PLANT SCHERER)
Published Date:
September 1, 2018
Location:
JUILETTE, GA
Value:
$220K
Architecture:
1 Lead l 7 Journeyman
About Project
Scope of Work:
• Demolition of all Allen Bradley wiring and disconnected the main power supply
• Installed the Foxboro System
• Validated all wiring and performance
PROJECT BACKGROUND:
Baghouse PLC to DCS Conversion
PROJECT CHALLENGES:
(1) Updated Electrical Drawings
PROJECT SOLUTIONS:
(1) Performed site walk throughs and documented all findings
(2) Assigned 1 SG team member to work closely with Engineering daily
(3) Provided redline drawings of updated electrical system
PROJECT RESULTS:
Engineering made modifications related to how GP drawings are received from SoCo. Job was completed on time and under budget